Geosynthetics avoid potential collapse of a canal
Project information
Construction project
Black Canyon Irrigation District Canal lining projectCustomer
Black Canyon Irrigation DistrictConstruction
Black Canyon Irrigation DistrictLocation
Notus , USConstruction time
October 2007Products used
Project details

Project description
The elevated unlined irrigation canal along the 1-mile section was seeping along its sides into the adjacent farmer’s field. To avoid a potential collapse of the canal along this section, lining this section was proposed.
Solution
It was recommended to Black Canyon Irrigation to use a composite to eliminate the seepage along the 1-mile section. In October 2007, the Black Canyon Irrigation District installed the material parallel to the canal using its own personnel. The Composites was seamed using a hot melt adhesive at a rate of 1 lb/6 feet of seam.
Benefits
They supplied 25 feet wide x 300 feet long rolls which shortened the installation timeframe, and reduced the number of seams. The product is user friendly which permitted the Black Canayon Irrigation District to utilize its own personnel to install the material which was a cost savings to the District.