Geosynthetics in infrastructure construction: innovative working platforms for safe construction projects
Letter IconFacebook IconLinkedIn IconIcon YouTube
HUESKER Inc.
3701 Arco Corporate Drive
NC 28273 Charlotte
USA

Plant and Working Platform Stabilization

Challenge

As ore body discoveries are made in more remote locations with increased areas of soft ground the requirement for safe, stable working platforms, temporary access road and permanent roads is proving more critical than ever.

Solution
 

Project specific geosynthetic design solutions from HUESKER provide superior structural integrity of foundation and basal layers within platform and road pavements. Our designs can assist with reducing the need for excavation of poor soils or hauling such materials from site. This saves valuable time and money.

Advantages

  • Enhanced bearing capacity for very soft/soft soils through the introduction of appropriate geosynthetic reinforcement

  • Extended lifetime and reduction in maintenance

  • Reduced requirement of imported construction materials

  • Significant reduction of construction time

  • Reduced carbon footprints due to thinner construction

Aaron Parsons

Your contact person

Aaron Parsons has been the Mining Business Area Manager at HUESKER Inc. since August 2023, utilizing his sales and industry expertise to strengthen client relationships. He has extensive experience in budgeting, sales optimization, and data-driven decision-making. Aaron holds a B.S. in Industrial Mathematics and Statistics from West Virginia University and currently resides in Birmingham, Alabama.

Gallery

Further information

can be found here
Icon for brochure downloadAnimated icon to download the brochure
Image to call up our referencesAnimated image to call up our references
References
All References