Plant and Working Platform Stabilization
Challenge
As ore body discoveries are made in more remote locations with increased areas of soft ground the requirement for safe, stable working platforms, temporary access road and permanent roads is proving more critical than ever.
Solution
Project specific geosynthetic design solutions from HUESKER provide superior structural integrity of foundation and basal layers within platform and road pavements. Our designs can assist with reducing the need for excavation of poor soils or hauling such materials from site. This saves valuable time and money.
Advantages
Enhanced bearing capacity for very soft/soft soils through the introduction of appropriate geosynthetic reinforcement
Extended lifetime and reduction in maintenance
Reduced requirement of imported construction materials
Significant reduction of construction time
Reduced carbon footprints due to thinner construction
Aaron Parsons
Your contact person
Aaron Parsons has been the Mining Business Area Manager at HUESKER Inc. since August 2023, utilizing his sales and industry expertise to strengthen client relationships. He has extensive experience in budgeting, sales optimization, and data-driven decision-making. Aaron holds a B.S. in Industrial Mathematics and Statistics from West Virginia University and currently resides in Birmingham, Alabama.