Project information

Building mesure

Black Canyon Irrigation District Canal lining project

Location

Notus, Idaho, US

Principal

Black Canyon Irrigation District

Building construction

Black Canyon Irrigation District

Building time

October 2007

Gallery

 |
 |
 |
 |

Project details

Task

The elevated unlined irrigation canal along the 1-mile section was seeping along its sides into the adjacent farmer’s field. To avoid a potential collapse of the canal along this section, lining this section was proposed.

Solution

It was recommended to Black Canyon Irrigation to use a composite to eliminate the seepage along the 1-mile section. In October 2007, the Black Canyon Irrigation District installed the material parallel to the canal using its own personnel. The Composites was seamed using a hot melt adhesive at a rate of 1 lb/6 feet of seam.

Benefits

They supplied 25 feet wide x 300 feet long rolls which shortened the installation timeframe, and reduced the number of seams. The product is user friendly which permitted the Black Canyon Irrigation District to utilize its own personnel to install the material which was a cost savings to the District.


Also interesting